Heights Electric Inc.
On Time·On Demand·On Budget ECRA/ESA Licensed Electrical Contractor
Instant Online Price – EV Chargers & Panel Upgrades Self-estimate
Service areas / Toronto

Electrical Panel & Service Upgrades in Toronto

We pull the ESA permit, coordinate the disconnect with Toronto Hydro, and hand you the certificate at the end. Toronto's older housing throws up more surprises than most — we price for what we find, not for the best case.

What it costs in Toronto

A new panel on your existing service starts at $1,599. A full 200A upgrade, from Toronto Hydro's wires to the breakers, starts at $2,799. The ESA permit is $199 on top, and the Toronto Hydro charge is separate again (see below). In an older house the meter base and mast are usually part of it, and our price already allows for that.

What Toronto houses usually have

The old city — Riverdale, the Danforth, Leslieville, the Junction, High Park, the Beaches. A lot of these are still on 60A or 100A, and a good number have a fuse panel or original wiring in places. If the service is 60A, an upgrade is not optional for most modern loads.

Post-war Etobicoke, North York, Scarborough and East York. Usually 100A, often at its limit once there is electric heat, air conditioning or a finished basement.

Newer builds and infill. Usually already 200A, so you may only need breaker space rather than more power — much cheaper.

Semis and row houses are where the mast and meter position matters most. On an attached house the service often runs up a shared wall, and that decides what the job costs. We look before we quote.

Sometimes the answer is smaller

If the house has the power but the panel has no spaces, a sub-panel ($999–$1,199) or a few extra slots ($99–$199) fixes it without Toronto Hydro at all. A load calculation tells us which case you are in, and we show you the numbers.

Toronto reasons to upgrade

  • A 60A service or a fuse panel that an insurer will not cover
  • A basement or laneway rental unit that needs its own capacity
  • Air conditioning or a heat pump in a house built before either existed
  • An EV charger in the garage or a rear-lane parking pad
  • A renovation that opens the walls anyway

Toronto Hydro — and one thing worth knowing

Toronto's utility is Toronto Hydro, and a service upgrade needs them to disconnect and reconnect. We book and coordinate all of it.

Unlike some other utilities in the GTA, Toronto Hydro charges for the disconnect and reconnect every time — there is no free one each year. That charge is between you and them, not part of our price, and we would rather you heard it from us at the quote than from a bill afterwards.

How the day goes

We file the ESA permit first and send Toronto Hydro the isolation request. On the day their crew cuts the power, we change what needs changing, and the ESA inspector checks it. Once it passes, Toronto Hydro reconnects and you get the certificate. Expect a weekday with the power off for most of it.

Adding a charger too?

Book the charger with the upgrade and the whole job is 10% off. It also saves paying Toronto Hydro for a second disconnect later.

Where we work in Toronto

Etobicoke, North York, Scarborough, East York and the old city — north into Markham and Richmond Hill, and west into Mississauga, Oakville, Brampton and Milton.

Why Heights Electric

  • We price Toronto Hydro's charge into the conversation, not the surprise
  • Licensed contractor, ECRA/ESA #7015891
  • Permit, inspection and certificate included in the process
  • Two years' full warranty
  • 5.0 stars on Google